Connection components & accessories
View the product groups for your installation. The right version depends on your equipment and installation.
Victron Lithium SuperPack 12.8V/60Ah (M6)
Victron Lithium SuperPack 12.8V/60Ah (M6)
In stock
Couldn't load pickup availability
Niet op voorraad in Raalte; afhalen kan na bestelling. Bestel vooraf; we laten weten zodra het klaarligt.
The Lithium SuperPack 12.8/60 offers an excellent balance between capacity and size, with built-in protection for optimal safety and performance. Thanks to the integrated BMS, this battery is easy to install and use. The internal switch protects against overcharging, over-discharging, and extreme temperatures. Series connection is not permitted.
Product information and features
Description ▾
Lithium SuperPack 12.8/60 - Versatile battery with easy installation
Benefits:
- Can be connected in parallel for more capacity.
- Tolerates partial charging for a longer lifespan.
- Integrated protection for maximum reliability.
Specifications ▾
- Nominal voltage: 12.8 V
- Capacity: 60 Ah (768 Wh)
- Efficiency: 92% round-trip efficiency
- Lifespan: 2500 cycles at 80% DoD
- Maximum continuous discharge current: 30 A
- Peak discharge current (10 sec.): 80 A
- Maximum continuous charge current: 30 A
- Dimensions: 213 x 229 x 138 mm
- Weight: 9.5 kg
- Protection rating: IP43
Frequently asked questions ▾
What is the difference between the Lithium SuperPack and other Victron Lithium batteries?
The SuperPack batteries have an integrated BMS and safety switch, making installation easier. With other models, a separate BMS often needs to be purchased.
Can this battery be connected in series?
No, series connection is not permitted.
Installation and connection
Check that the battery voltage, capacity, BMS, and charging equipment are mutually compatible. Mount the battery securely, in a dry and easily accessible location, and follow Victron's instructions for cabling, fuses, and commissioning.
Important considerations
Match the product to the entire installation. Before commissioning, check the polarity, protection, cable connections, and settings. If in doubt, have the work carried out or checked by a qualified installer.
